Beta
10 CFR § 1003.5
10 CFR § 1003.5 — § 1003.5 Extension of time.
Beta. Legal information, not legal advice. LEGALDIGM is not a law firm. Check the official source for the current text.
Analyze this law with AI§ 1003.5 Extension of time.
When a document is required to be filed within a prescribed time, an extension of time to file may be granted by the OHA upon good cause shown.
